Suncor Canada Ltd.

Date

2001/10

Client

Suncor Canada Ltd.

Material

Steel Casing

Location

Fort McMurray

Crossing

Geotechnical Condition

Various (including limestone)

Multiple case bores were completed throughout 2001 for Suncor in conjunction with various contractors.  It involved case boring 1050mm and 900mm steel casings.  Part of the work consisted of 900mm casing being installed through soil containing limestone with densities up to 15,00 psi.